Shipping, Delivery & Lead Time for Selective Soldering Equipment
Equipment logistics
Equipment Shipping & Lead Time
Selective soldering equipment delivery with clear production timing and freight coordination.

Lead Time You Can Plan Around
For international equipment buyers, delivery planning starts before the machine leaves our factory. We confirm the equipment scope, production schedule, packing method, freight route, and handover documents early in the project.
Days for standard equipment
For standard selective soldering equipment, the usual production lead time is about 35 days after technical and order confirmation.
Days for customized equipment
Custom voltage, line direction, multi-nozzle configuration, fixtures, special options, or project-specific engineering may extend the schedule to 45 days, 60 days, or up to about 90 days depending on scope.
Freight Options for Overseas Buyers
Sea Freight
Suitable for large equipment and full-line shipments where cost control matters and the customer has enough project schedule.
Air Freight
Used when urgent delivery is more important than freight cost, especially for smaller equipment, spare parts, or time-sensitive production needs.
Land Transport
Available where the destination route supports land delivery. This can be useful for regional shipments or combined transport solutions.

Use Your Forwarder or Use Ours
If you already have a trusted freight forwarder, we can coordinate pickup, export documents, packing photos, machine dimensions, gross weight, and loading requirements with your logistics team.
- If you do not have a forwarder, you can use our long-term logistics partners.
- We have worked with reliable freight forwarders for around 10 years.
- They can help arrange air freight, sea freight, or land transport based on destination and project timing.
What Happens Before Shipment
Confirm equipment scope
Model, options, voltage, language, line direction, spare parts, and project documents are checked before production starts.
Build and test
The machine is assembled, debugged, and prepared for factory inspection or remote confirmation when required.
Pack for transport
We prepare protective wrapping, wooden cases, labels, packing photos, dimensions, and gross weight for freight booking.
Coordinate handover
We support communication with your forwarder or our logistics partner for pickup, export, and shipping arrangement.
Information Buyers Should Confirm Early
- Destination country, port, airport, or delivery address.
- Preferred freight method and required arrival window.
- Whether your own forwarder will handle pickup.
- Consignee details, customs broker, and import documents.
- Site unloading conditions for large wooden cases.
- Any special packing, marking, insurance, or document request.

FAQ About Delivery and Lead Time
Is 35 days the total delivery time?
No. The 35 days refers to the usual production lead time for standard equipment. International freight transit and customs clearance are additional.
Why can customized equipment take 45-90 days?
Custom engineering may require extra design confirmation, component procurement, fixture preparation, software settings, testing, and customer approval before shipment.
Can I use my own freight forwarder?
Yes. If you have your own forwarder, we can work with them for pickup, packing information, export coordination, and loading details.
Can I use I.C.T logistics partners?
Yes. If you do not have a forwarder, our long-term freight partners can help arrange a suitable route by air, sea, or land where available.
What should I prepare before shipment?
Please confirm consignee information, destination, delivery terms, import requirements, customs broker, and unloading conditions as early as possible.
Plan your equipment delivery with I.C.T
Send your destination, machine model, and required timeline. We will help confirm production lead time and freight options.